Applications Open
November 24, 2020
Applications Close
December 18, 2020
Civil Works
Replacement of 3 Bridges - Barfold
- Castlemaine
Client Information
-
- Mount Alexander Shire Council
-
- Andrea OGrady
Project Information
Budget
N/A
Project Description
The objective of this project is for the design and construction of replacement of 3 (Three) bridges that are in poor condition and will enable the current load limits to be lifted. There are a number of alternative structures that would be acceptable to Council. These include but not limited to bridges, culverts, cast in-situ deck slab, precast planks with top slab and precast deck units.
The designs shall be in accordance with the technical and design requirements detailed in section 3. The designs must be fit for purpose paying due attention to sustainability principles and cost effectiveness.
Attached Files
This project does not have any attachments.